Cementarnica USJE AD Skopje – TITAN GROUP

Project:

PRE-DEDUSTING before Coal Mill.

Brief description:

Installation of piping, equipment and insulation to transport hot gases from the kiln to the vertical mill.

Realized activities:

Equipment for Mounting:

  • Pipeline with different diameters and insulation;
  • Steel pillar on the concrete platform;
  • Hurriclon 2000 st with outlet spiral;
  • Rotary and slide gates;
  • Meal diverter;
  • Screw conveyor;
  • Shut off flap;
  • Textile expansion joints;
  • Counter flanges and deflectors;
  • Hurriclon fan;
  • Booster fan and;
  • All needed steel construction of about 100 tons.
r59
r59c

Please contact us for more details!

Event Calendar

Jan             Feb             Mar             Apr
May            Jun              Jul               Aug
Sep             Oct             Nov             Dec

 

CUSTOMER VALUES

After-Sales service

Our prime goal – to make our customers’ equipment work more efficiently and trouble-free.

Each product – susceptible to installation and commissioning by a specialized work team;

REFERENCE

BELGRAD HEATING PLANTS


Production and delivery of End Suction Centrifugal Pumps ST35CP65; ST30CP51 and one pump type: MSH 40-9. This pumps is for transport of hot water for propose of needs for BELGRAD HEATING  PLANTS  in Srbija.

Why you should contact us?

In the decision process of choosing an adequate representative company we will be evaluating several criteria: its reputation on the specific market, sales organization and after sales service capability, use of promotional and communications tools, the financial strength and size of the company, the existence of physical facilities and willingness to carry inventories, and the trading areas covered and the compatibility of represented companies with our product range.

Address:location
Str. Pero Nakov 126, 1000 Skopje, Republic of Macedonia

Tel:tel
+389 (0)2 254 98 17
Fax:
+389 (0)2 254 98 33

Contact:mail
info@pumpi.com.mk
www.pumpi.com.mk

MZT Logo

Copyrights © 2018