Ferro Nickel - Kosovo

Project:

Design, Manufacturing, Installation and launching into operation of the reconstructed system for lifting and transporting dust with increased capacity of 40%.


Brief description:

Design, Manufacturing, Installation and launching into operation of the reconstructed system for lifting and transporting dust with increased capacity of 40%, by:

  • Increasing the capacity of the elevators on the line 1 and line 2;
  • Lead dust from the elevators.

Realized activities:

  • Complete replacement of drive unit;
  • Complete replacement of take up unit;
  • Manufacturing and replacement of buckets for elevators with increased volume;
  • Replacement of chains for elevators;
  • Reconstruction of unloading of dust;
  • Design and manufacture of dust transporters for increased capacity, with a central transport chain;
  • Assembly of the overall equipment.