Reference BookDownload

Regional Water Company “PRISHTINA", Kosovo

Project:

Construction of booster pump station BESI - Prishtina.


Brief description:

The main purpose of the booster pump station “Besi“ was providing additional quantity of drinking water (0,9 m3/s) for water supplying town of Pristina.


Realized activities:

  • Design and production of 2 double inlet pump units Q=450l/s, H=85m, Pm=1560kW, n=1450rpm, U=400V;
  • Installation of pipes;
  • Installation of valves with actuators, non return valves and piping armature;
  • Supply and installation of two frequency converters;
  • Supply and installation of two transformers;
  • Commissioning.

Please contact us for more details!

 


Refernce 1Reference 2