US STEEL - Serbia

Project:

Production, supervision during installation and start up of pumps for furnace cooling in US Steel - Serbia.


Brief description:

The purpose of the project was increasing the furnace capacity. In the project were predicted new pumps with double flow capacity existing. A new pump station for back water was constructed and equipped with new pumps.


Realized activities:

  • Design and production of 2 pump units Q=4000m3/h, H=80m, Pm=1300kW, n=1000rpm, U=6000V;
  • Design and production of 2 pump units Q=4000m3/h, H=10m, Pm=160kW, n=500 rpm, U=400V;
  • Supervision during installation and commissioning.