Ferro Nickel - Kosovo

Project:

Design, Manufacturing, Installation and putting into operation of the reconstructed system for lifting and transporting dust with increased capacity of 40%


Realization of the project:

2011 year


Brief discription:

Design, Manufacturing, Installation and putting into operation of the reconstructed system for lifting and transporting dust with increased capacity of 40%, by:

  • Increasing the capacity of the elevators on the line 1 and line 2
  • Lead dust from the elevators

Realized activities:

  • Complete replacement of drive unit
  • Complete replacement of take up unit
  • Manufacturing and replacement of buckets for elevators with increased volume
  • Replacement of chains for elevators
  • Reconstruction of unloading of dust
  • Design and manufacture of dust transporters for increased capacity, with a central transport chain
  • Assembly of the overall equipment

Refernce 1