Project:

Project: Design, manufacture and installation of feeder for adding ore to the pit with a capacity of 600 t / h


Realization of the project:

2011 year


Brief discription:

Design, manufacture and installation of transporter for adding ore to Mine with pit exploatation.


Realized activities:

  • Design of feeder for adding ore, with three chains and cross beams with capacity of l = 600 t / h
  • Manufacturing of steel construction
  • Manufacturing of the drive unit with sprockets, coupling and gears
  • Manufacturing of take up unit with sprockets
  • Supply chains and production of cross beams
  • Assembly and commissioning of feeder for adding the ore