Полный Справочник PDF 9 mb Скачать

ELEKTROPRIVREDA – Bosnia & Herzegovina

Project:

Production, supervision during installation and startup of 39 pump aggregates for transport of pit clean and slightly polluted water for the Company Elektroprivreda-Bosnia and Herzegovina.


Realization of the project:

2011 year


Brief discription:

The pump aggregates are intended for transport of pit clean and slightly polluted water for the Company Elektroprivreda-Bosnia and Herzegovina.


Realized activities:

  • Design and production of 4 types of centrifugal pump units for the purpose of Thermal-power plant Kakanj with Capacity up to: Q=3600-4600 [l/m], H=170 [m] for transport of pit clean and slightly water.
  • Design and production of 2 pump units Q=4000 [m3/h], H=10 [m], Pm=160 [kW], n=500 [rpm], U=400 [V]
  • Tuzla with Capacity up to: Q=7666 [l/m], H=190 [m] for transport of pit aggressive wastewater.
  • Design and production of centrifugal pump units for the purpose of Black Coal Mine Breza with Capacity up to: Q=4980 [l/m], H=350 [m] for transport of pit wastewater.
  • Design and production of 1 type of multistage centrifugal pump unit for the propose of Black Coal Mine Dzurdzevik with Capacity up to: Q=40-80 [l/s], H=220 [m] for transport of slightly polluted water.
  • Design and production of 1 type of multistage centrifugal pump unit for the purpose of Black Coal Mine Abid Lolic Bila-Travnik with Capacity up to: Q=800-1450 [l/m], H=252 [m] for transport of slightly polluted water.
  • Design and production of 9 types of centrifugal pump unit for the purpose of Black Coal Mine Zenica with Capacity up to: Q=3000 [l/m], H=170 [m] for transport of pit wastewater.
  • Supervision during installation and commissioning

Refernce 1Reference 2