Project:

Supply and installation of drainage pumps and auxiliary equipment, Benghazi, Libya


Realization of the project:

2010 year


Brief discription:

Project as component of AGOCO drainage system reconstruction including works for reconstruction of drainage pump station i.e. supply and installation of drainage pumps, electrical equipment and civil works.

Realized activities:

Production of vertical axial flow with regulating impeller blades:
  • [Q=5,6 m3/sec ; H=3,3m] – 4 pieces
  • [Q=2,6 m3/h; H=6m] – 4 pieces
  • [Q=1,7 m3/sec; H=5m] – 3 pieces
Installation of the pumps, valves and electrical equipment
Commissioning