FERONIKEL Plants Glogovac - Kosovo
Project:
Rehabilitation of crude oil pumping stations and storage tanks in Newco Ferronickeli Complex LLC, ferronickel production plant In Glogovac, Kosovo.
Brief description:
The system for crude oil was completely rehabilitated in Feronickel Glogovac – production plant. The thermal isolation was successfully installed, tested and launched into operation.
Realized activities:
- Rehabilitation of the pump station for crude oil (new pumps, valves, instrumentation, pipes, thermal insulation etc.);
- Design, manufacturing and commissioning of two steel tanks (volume 2x400m3) for crude oil and execution of new pipe connection to the pump station;
- Rehabilitation of the pump station for decantation of crude oil (rehabilitation of pumps, valves, instrumentation, pipes, thermal insulation);
- Rehabilitation of the pump station for crude oil, near by the tank with V=5000m3(rehabilitation of pumps, valves, instrumentation, pipes, thermal insulation);
- Reparation of the pump station for crude oil for daily needs and two steel tanks (volume 2x40m3);
- Commissioning.
Please contact us for more details!