Month: April 2018

BOOSTER SETS : BS

BOOSTER SETS : BS pbs

BOOSTER SETS – BS Various pressure booster packages tailored to suit a wide range of requirements in the water supply. Each system is carefully designed to meet the applications individual needs and it is selected on a basis of maximum reliability, durability, efficiency and economical operation. Pump model ranges are used to build standard and […]

FERONIKEL Plants Glogovac – Kosovo

FERONIKEL Plants Glogovac – Kosovo r10

FERONIKEL Plants Glogovac – Kosovo Project: Rehabilitation of crude oil pumping stations and storage tanks in Newco Ferronickeli Complex LLC, ferronickel production plant In Glogovac, Kosovo. Brief description: The system for crude oil was completely rehabilitated in Feronickel Glogovac – production plant. The thermal isolation was successfully installed, tested and launched into operation. Realized activities: […]

FERONIKEL COMPLEKS – Glogovac, Kosovo

FERONIKEL COMPLEKS – Glogovac, Kosovo r9a

FERONIKEL COMPLEKS – Glogovac, Kosovo Project: Reconstruction of the pump station – Bivolak. Brief description: The main objective of the project was rehabilitation of pump station for transport of technical water from Bivolak to the Feronikeli plant in Drenas. Realized activities: Supply and installation of valves and pipe equipment for vertical pumps; Rehabilitation of pumps; […]

Regional Water Company “PRISHTINA”, Kosovo

Regional Water Company “PRISHTINA”, Kosovo r4a

Regional Water Company “PRISHTINA”, Kosovo Project: Construction of booster pump station BESI – Prishtina. Brief description: The main purpose of the booster pump station “Besi“ was providing additional quantity of drinking water (0,9 m3/s) for water supplying town of Pristina. Realized activities: Design and production of 2 double inlet pump units Q=450l/s, H=85m, Pm=1560kW, n=1450rpm, […]

Skopski leguri – Skopje, Macedonia

Skopski leguri – Skopje, Macedonia r39

Skopski leguri – Skopje, Macedonia Project: Projection and manufacturing of pump station. Brief description: Projection and manufacturing of pump station for transport of water from the furnace for ferronickel melting to the cooling tower. Realized activities: Three pumps with characteristics Q=890m3/h, P=90kw with frequent regulation; Pipeline with length of 600m, Ø=500mm. Please contact us for more details!

LINDE CORROTECH INTERNATIONAL LLC – DUBAI

LINDE CORROTECH INTERNATIONAL LLC – DUBAI Project: Baghdad Municipality Corporation – Daura sewage water disposal network – Iraq. Brief description: Upgrading of drainage pump station, supply, installation and commissioning of drainage pumps, electrical equipment and civil construction activities. Realized activities: Production of vertical axial flow with regulating impeller blades: [Q=5,1m3/sec, H=3m] – 3pcs. [Q=2,7m3/h, H=6m] […]

PETROLCOMET Engineering – Libyan Branch

PETROLCOMET Engineering – Libyan Branch Project: Supply and installation of drainage pumps and auxiliary equipment – Benghazi, Libya. Brief description: Project as component of AGOCO drainage system reconstruction including works for reconstruction of drainage pump station i.e. supply and installation of drainage pumps, electrical equipment and civil works. Realized activities: -Production of vertical axial flow […]

Ferro Nickel – Kosovo

Ferro Nickel – Kosovo Ferro Nickel - Kosovo

Ferro Nickel – Kosovo Project: Design, Manufacturing, Installation and launching into operation of the reconstructed system for lifting and transporting dust with increased capacity of 40%. Brief description: Design, Manufacturing, Installation and launching into operation of the reconstructed system for lifting and transporting dust with increased capacity of 40%, by: Increasing the capacity of the […]

Feni Industry – Kavadarci, Macedonia

Feni Industry – Kavadarci, Macedonia r45a

Feni Industry – Kavadarci, Macedonia Project: Reconstruction of the chain system for transport of raw mine material. Brief description: Reconstruction of the chain system for transport of raw mine material. Realized activities: Dismantling of chain from Lepol Grid (POLYSIUS) with width 4m, length 90m with a total weight of 120tons.; Dismantling of supporting and return […]