Month: November 2021

KONVAR DOO Beograd Serbia

KONVAR DOO Beograd Serbia

Previous Next KONVAR DOO Beograd Serbia End user: Belgrade Power Plants Project: Production and delivery of 2 (Two) Multistage Pump aggregate type: 20MSD65-2. Brief description: The main objective of the project was manufacturing of 2 (Two) pump aggregate unit for the needs of Belgrade Power Plants for transport of hot water. Realized activities: Production and […]

GP PELISTER Bitola

GP PELISTER Bitola

Previous Next GP PELISTER Bitola End user: REK Bitola Project: Production and delivery of 1 (One) Multistage Pump aggregate type: 42DMSD200-3a. Brief description: The main objective of the project was manufacturing of 1 (One) pump aggregate unit for the needs of REK Bitola for transport of water. Realized activities: Production and delivery of 1 (One) […]

TENT, TENT B Obrenovac

TENT, TENT B Obrenovac

Previous Next TENT, TENT B Obrenovac – Serbia Project: Production and delivery of 2 (Two) Multistage Pumps aggregate type: KCP42-7. Brief description: The main objective of the project was manufacturing of 2 (two) pump aggregate units for the needs of TENT B Obrenovac Serbia for transport of water for fire protection system. Realized activities: Production […]