US STEEL – Serbia Project: Production, supervision during installation and start up of pumps for furnace cooling in US Steel – Serbia. Brief description: The purpose of the project was increasing the furnace capacity. In the project were predicted new pumps with double flow capacity existing. A new pump station for back water was constructed […]
Gomel Chemical Plant, Belarus
Gomel Chemical Plant – Belarus Project: Production and delivery of Split case Double Suction pump type: D 45-30-46 for the needs of the Gomel Chemical Plant, Belarus. Brief description: The main purpose of this project was to design and produce a Split case Double Suction pump for transport of technical water for the needs of […]
LUTHMAR Pompy I Armatura Przemyslowa – Poland
LUTHMAR Pompy I Armatura Przemyslowa – Poland Project: Production and delivery of Deep well pump type: DP 14-2c for the needs of Chemical plant in Poland. Brief description: The main purpose of this project was to design and produce deep well pump for transport of water for the needs of the Chemical Plant in Poland. […]
NIS – Gazprom Neft – Serbia
NIS – Gazprom Neft – Serbia Project: Production and delivery of Vertical Multistage pump type 33VMS125-2b for water transfer. Brief description: The main objective of the project was manufacturing of 2 complete aggregates of Vertical Multistage pumps for transfer of water for the needs of our customer NIS – Gazprom Neft from Serbia. Realized activities: […]
DONG-IL ENT CO., LTD – South Korea
DONG-IL ENT CO., LTD – South Korea Project: Production and delivery of 7 Screw Spindle pumps for the needs of Daewoo Shipbuilding & Marine Engineering. Brief description: MZT Pumpi has specially designed and delivered 7 Screw Spindle pumps to the South Korea company DONG-IL ENT CO., LTD. for the needs of their client Daewoo Shipbuilding […]
RDA Petrol – Albania
RDA Petrol – Albania Project: Design, production, installation and start up of End Suction Centrifugal Pumps for the needs of the company RDA Petrol-Albania. Brief description: The main objective of this project was manufacturing of End Suction Centrifugal Pumps for transport of petrol products for the Terminal RDA Petrol-Albania. Realized activities: Design, Production and Installation […]
JKP Vodovod i Kanalizacija
Prostream Group Bulgaria Project: Production and delivery of 7 complete pump sets for the needs of the Petroleum Group of Companies KASTRATI SH.A. from Albania for Diesel oil / petrol transfer. Brief description: 5 plus 2 pumps sets (7 horizontal end suction centrifugal types of pumps) were specially designed for the need of the Petroleum […]
KASTRATI SH.A., Albania
KASTRATI SH.A. – Albania Project: Production and delivery of 7 complete pump sets for the needs of the Petroleum Group of Companies KASTRATI SH.A. from Albania for Diesel oil / petrol transfer. Brief description: 5 plus 2 pumps sets (7 horizontal end suction centrifugal types of pumps) were specially designed for the need of the […]