Previous Next BELGRADE WATER WORKS AND SEWERAGE , Serbia Project: Capital Repair and Servicing of 2 (two) Propeller Pumps, model 8PR-8 Manufaturer by Litostroj Slovenia and Model R-042 manufactured by Jastrebac Serbia. Brief description: The main objective of the project was Capital Repair and Servicing of 2 (two) Propeller Pumps for Drainage , model 8PR-8 […]
Delivery of Screw Spindle Pumps for client in Macedonia
Previous Next Delivery of Screw Spindle Pumps for client in Macedonia Project: Production and delivery of 5 Screw Spindle Pumps model HVP3/2MS (4) and model HVP2/2MS (1). Brief description: The main objective of the project was production and delivery of 5 Screw Spindle Pumps for transport of fuel oil. Realized activities: Production and delivery of […]
Municipality of Ohrid-Pump Station Sipokno, Macedonia
Previous Next Municipality of Ohrid-Pump Station Sipokno, Macedonia Project: Production and delivery of 2(two) Vertical Multistage Centrifugal pumps type: 15MSSI 40-4, complete with Pressure Vessel with interchangeable membrane and Control Panel for Monitoring. Brief description: The main objective of the project was production and delivery of of 2(two) Vertical Multistage Centrifugal pumps type: 15MSSI 40-4, […]
EPS RS Kolubara – Serbia
Previous Next EPS RS Kolubara – Serbia Project: Production and delivery of 2 (Two) Screw Spindle Bare Shaft Pumps Type: KHVP 15/3MZ. Brief description: The main objective of the project was manufacturing of 2 (Two) Bare Shaft units for the needs of EPS RS Kolubara, Serbia for transport of Fuel oil at 100C. Realized activities: […]
Thermal Power Plant TENT B Obrenovac Serbia
Previous Next Thermal Power Plant TENT B Obrenovac- Serbia Project: Production and delivery of 2 (Two) Horizontal Multistage Pumps aggregate type: KCP42-7 with mechanical seal. Brief description: The main objective of the project was manufacturing of 2 (two) pump aggregate KCP42-7 units for the needs of TENT B Obrenovac Serbia for transport of water for […]
Thermal Power Plant TENT A – Serbia
Previous Next Thermal Power Plant TENT A – Serbia Project: Production and delivery of 3 (Three) End Suction Centrifugal Pumps aggregate type: SCP40-125 and 1 (One) Rotary assembly for pump KHVP-A-20/MZ. Brief description: The main objective of the project was manufacturing of 3 (Three) pumps aggregate units SCP40-125 for the needs of end client TENT […]
Public utility company “Water Supply” Bor – Serbia
Previous Next Public utility company “Water Supply” Bor – Serbia Project: Production and delivery of 2 sets of Hydro station that include Vertical Multistage Pump Aggregate type: HS 2 x CS3-6 . Brief description: The main objective of the project was manufacturing of Hydro station from Vertical Multistage Pump Aggregate (Two sets) pump type CS3-6 […]
NIS a.d. Novi Sad – Serbia
Previous Next NIS a.d. Novi Sad – Serbia Project: Production and delivery of Horizontal Multistage Pump Aggregate type: C18-8a with complete Spare parts for 2 years. Brief description: The main objective of the project was manufacturing of Horizontal Multistage Pump Aggregate (One) C18-8a to be replaced the old one for the needs for NIS a.d. […]
INSTALATER DOO – Serbia
Previous Next INSTALATER DOO – Serbia Project: Production and delivery of System 2SVPF20p/2MZ, Type: SVPF who is consisting of 2 pump Aggregate KHVP20/2MZ. Brief description: The main objective of the project was manufacturing of System 2 (Two) KHVP20-2MZ pump units for the needs for Instalater in Serbia, for transport of oil. Realized activities: Design& manufacturing, […]
EPS RB Kolubara
Previous Next EPS RB Kolubara Project: Production and delivery of 1 (One) End Suction Centrifugal Pumps aggregate type: SCP65-200. Brief description: The main objective of the project was manufacturing of 1 (One) pump units for the needs of end client EPS RB Kolubara – Serbia for transport of Condensate Water. Realized activities: Production and delivery […]