TOFAMA - Poland

Project:

Design, Fabrication and Assembly of steel construction equipment for Crushing and Separation Plant.

Brief description:

The main purpose of this project was to design and produce all the steel construction components for the sand/ gravel separation plant in which the Metso’s cone crusher HP 200, Deck Screens and Vibro Freeders had to be mounted.

Besides platforms for Metso’s equipment, METALEX designed and produced 10 (ten) belt conveyors of different lengths and widths with side walkways.

Realized activities:

  • Manufacturing of 10 conveyor belts;
  • Manufacturing of 4 platforms;
  • Manufacturing of 2 steel bunkers;
  • Manufacturing of steel construction;
  • Supervision douring installation and commissioning.

Please contact us for more details!

Event Calendar

Jan            Feb            Mar             Apr
May           Jun             Jul               Aug
Sep            Oct            Nov             Dec

CUSTOMER VALUES

After-Sales service

Our prime goal – to make our customers’ equipment work more efficiently and trouble-free.

Each product – susceptible to installation and commissioning by a specialized work team;

REFERENCE

STRABAG AG Subsidiary STABAG Skopje, PS Udovo, Macedonia

Production and delivery of 4 (four) Propeller pump aggregates units for the needs of Pump Station Udovo – Macedonia for transport of clean water.

Why you should contact us?

In the decision process of choosing an adequate representative company we will be evaluating several criteria: its reputation on the specific market, sales organization and after sales service capability, use of promotional and communications tools, the financial strength and size of the company, the existence of physical facilities and willingness to carry inventories, and the trading areas covered and the compatibility of represented companies with our product range.