Belgrade heating plants, Belgrade - Serbia
Project:
Production and delivery of 16 pump units.
Brief description:
The main objective of the project was extending the existing heating system in Belgrade, Serbia. Four pump stations were equipped with new pump equipment. The temperature of transported water was between 90-200°C.
Realized activities:
- Design, production and supervision during installation and start up of 5 pump units Q=1600m3/h, H=12bar, Pm=710kW;
- Design, production and supervision during installation and start up of 1 pump unit Q=1800m3/h, H= 5.2bar, Pm=355kW;
- Design, production and supervision during installation and start up of 7 pump units Q=1100m3/h, H=5bar, Pm=250kW;
- Design, production and supervision during installation and start up of 1 pump units Q=200m3/h, H=11bar, Pm=200kW;
- Design , production and supervision during installation and start up of 2 pump units Q=30m3/h, H=11bar, Pm=37kW.