Project:
PRE-DEDUSTING before Coal Mill.
Brief description:
Installation of piping, equipment and insulation to transport hot gases from the kiln to the vertical mill.
Realized activities:
Equipment for Mounting:
- Pipeline with different diameters and insulation;
- Steel pillar on the concrete platform;
- Hurriclon 2000 st with outlet spiral;
- Rotary and slide gates;
- Meal diverter;
- Screw conveyor;
- Shut off flap;
- Textile expansion joints;
- Counter flanges and deflectors;
- Hurriclon fan;
- Booster fan and;
- All needed steel construction of about 100 tons.