EL TRANS DOOEL GOSTIVAR
Project:
Capital Repair and Servicing with delivery of 1 (One) Multistage Centrifugal Pump type: KCP122-10.
Brief description:
The main objective of the project was Capital Repair and Servicing of 1 (One) pump KCP122-10. That was made A full service was performed according to the defect list, as well as the installation of the pump with commissioning for the needs of EL TRANS DOOEL Gostivar for transport of Water.
Realized activities:
– Capital Repair of 1(One) Multistage Centrifugal Pump KCP122-10 parameters of the pump are as follows:
– Capacity: 12 – 20 l/sek, Head: 230-190 meters.
– Engine 75 KW/1450RPM;
The following activities were realized by MZT Pump:
– Replacement of all sleeves and distant sleeves in the pump.
– Replacement of new shaft complete with all equipment in the pump.
– Replacement of new bearings, sealings, soft packing and replacement of all bolts.
The pump was dismantled from end client, cleaned internally and mounted after replacement of all parts. The pump was tested and put into operation at end client facility in El Trans Dooel Gostivar.
Please contact us for more details!