Thermal Power Plant NIKOLA TESLA-KOLUBARA

r84a

Thermal Power Plant NIKOLA TESLA – KOLUBARA Project: Production and delivery of Multistage Centrifugal Pump type 20MSD 65-6, for transport of Condensate. Brief description: The main objective of this project was manufacturing of Multistage Centrifugal Pump type 20MSD 65-6, for transport of Condensate for the needs of the client Thermal Power Plant Kolubara – Serbia. […]

Thermal Power Plant “Tuzla” –Bosnia & Herzegovina

r58a

Thermal Power Plant “Tuzla” – Bosnia & Herzegovina Project: Production and delivery of Multistage pump type: 42 DMSD 200-5 for the needs of Thermal Power Plant “Tuzla” – Bosnia & Herzegovina. Brief description: The main aim of this project was production and delivery of multistage pump for transport of hot water with operation fluid temperature […]

F&C Total Group Srl. – Romania

r54a

F&C Total Group Srl. – Romania Project: Production and delivery of End Suction Centrifugal pumps, equipped with electric motors for water supply for needs of Power industry in Romania. Brief description: The main objective of the project was production and delivery of two aggregates of End Suction Centrifugal pumps – with application in Power industry […]

BOBOV DOL – Bulgaria

BOBOV DOL - Bulgaria

BOBOV DOL – Bulgaria Project: Production, supervision during installation and startup of pumps for transport of lime milk for the process of gas cleaning in the thermal power plant Bobov Dol-Bulgaria. Brief description: The pumps are intended for transport of lime milk for the process of gas cleaning in the thermal power plant Bobov Dol-Bulgaria. […]

ELEKTROPRIVREDA – Bosnia & Herzegovina

r49a

ELEKTROPRIVREDA – Bosnia & Herzegovina Project: Production, supervision during installation and startup of 39 pump aggregates for transport of pit clean and slightly polluted water for the Company Elektroprivreda-Bosnia and Herzegovina. Brief description: The pump aggregates are intended for transport of pit clean and slightly polluted water for the Company Elektroprivreda-Bosnia and Herzegovina. Realized activities: […]

Hydro Power Plant “Djerdap” – Serbia

Hydro Power Plant “Djerdap” – Serbia Project: Production and delivery of Deep Well Pump, Type: DP14-4L for transport of river water. Brief description: The main objective of the project was delivery of 3 (three) deep well pumps for the needs of our client in Serbia and supporting their mission to increase the hydro power energy […]

TE „KOLUBARA A“, VELIKI CRLJENI – Serbia

TE „KOLUBARA A“, VELIKI CRLJENI – Serbia Project: Production and delivery of Deep Well Pump, Type: DP14-8L for transport of river water. Brief description: The main objective of the project was delivery of deep well pump for the needs of our client in Serbia and supporting their mission to increase the energy production. Realized activities: […]

TE MORAVA, Serbia

Hydro Power Plant “MORAVA” – Serbia Project: Production and delivery of Vertical Multistage Centrifugal Pump, Type: 42VMSL250-4 for transport of river water. Brief description: The main objective of the project was delivery of complete system of Vertical Multistage Centrifugal Pumps for the needs of our client in Serbia and supporting their mission to increase the […]