Prostream Group Bulgaria
Project:
Production and delivery of End Suction Centrifugal pump SCP 125-315, equipped with electric motor and control panel with soft starter, for water supply of the touristic place Albena.
Brief description:
The main objective of this project was replacement of the existing pumps at pump station Albena, with new improved pump units, with purpose of water supply of hotels in the touristic town of Albena, Bulgaria.
Realized activities:
- Manufacturing of End Suction Centrifugal Pump unit SCP 125-315,with the following characteristrics: -Q=100 l/s; TDH=100m; 160KW; n=2900 rpm.
- The pump was delivered together with control panel with soft starter, equipped with electric engine and spacer coupling.
Please contact us for more details!