Regional Water Company “PRISHTINA", Kosovo

Project:

Construction of booster pump station BESI – Prishtina.

Brief description:

  • The main purpose of the booster pump station “Besi“ was providing additional quantity of drinking water (0,9 m3/s) for water supplying town of Pristina.

Realized activities:

  • Design and production of 2 double inlet pump units Q=450l/s, H=85m, Pm=1560kW, n=1450rpm, U=400V;
  • Installation of pipes;
  • Installation of valves with actuators, non return valves and piping armature;
  • Supply and installation of two frequency converters;
  • Supply and installation of two transformers;
  • Commissioning.
r4b
r4c

Please contact us for more details!

Event Calendar

Jan            Feb            Mar             Apr
May           Jun             Jul               Aug
Sep            Oct            Nov             Dec

CUSTOMER VALUES

After-Sales service

Our prime goal – to make our customers’ equipment work more efficiently and trouble-free.

Each product – susceptible to installation and commissioning by a specialized work team;

REFERENCE

STRABAG AG Subsidiary STABAG Skopje, PS Udovo, Macedonia

Production and delivery of 4 (four) Propeller pump aggregates units for the needs of Pump Station Udovo – Macedonia for transport of clean water.

Why you should contact us?

In the decision process of choosing an adequate representative company we will be evaluating several criteria: its reputation on the specific market, sales organization and after sales service capability, use of promotional and communications tools, the financial strength and size of the company, the existence of physical facilities and willingness to carry inventories, and the trading areas covered and the compatibility of represented companies with our product range.