TOPLINA DOOEL OHRID – MACEDONIA

Client: “TOPLINA DOOEL OHRID – MACEDONIA” Project: “Pumping water from a lake for coal mining in REK Bitola” Project: Production, delivery and put in operation of 1 (One) Horizontal multistage Centrifugal Pumps type: 42DMSD200-3 for pumping water from a lake for coal mining in REK Bitola. Brief description: Project Description: – Construction Part (Production, delivery […]

EPS AD, BELGRAD -TE-KO KOSTOLAC, SERBIA

EPS AD, BELGRAD -TE-KO KOSTOLAC, SERBIA Project: Capital Repair and Servicing of 1 (One) Propeller Pumps, type BPV 8-3 Model R-003 manufactured by Jastrebac Serbia. Brief description: The main objective of the project was Capital Repair and Servicing of 1 (One) Propeller Pump for Drainage, model BPV 8-3, R-003 manufactured by Jastrebac Serbia, for Suction […]

BUCIM Doo Copper mine Radovish Macedonia

BUCIM Doo Copper mine Radovish Macedonia Project: Production and delivery of Vertical  Deep Well Pump type: 2VPH-6a equipped  with Pump base and coupling. Brief description: The main objective of the project was manufacturing of 1 Vertical deep Well pump model 2VPH-6a, for the needs of BUCIM Doo Copper Mine, for transport of Technological water. Realized […]

DPTU Bucim Doo Radovish

Previous Next DPTU BUCIM DOO RADOVISH Project: Production, delivery of Deep Well Pump type: 2VPH-3 with Pump base and coupling. Brief description: The main objective of the project was manufacturing of (One) pump units for the needs of DPTU BUCIM Doo Radovis for transport of Technological water. Realized activities: Production and delivery of (One) Deep […]

DPTU BUCIM DOO RADOVISH

Previous Next DPTU BUCIM DOO RADOVISH Project: Production, delivery of Deep Well Pump type: 2VPH-3. Brief description: The main objective of the project was manufacturing of (One) Bare Shaft pump with base stool, complete coupling for the needs of DPTU BUCIM Radovish for transport of Technological water. Realized activities: Production and delivery of (One) Deep […]

GP PELISTER Bitola

Previous Next GP PELISTER Bitola End user: REK Bitola Project: Production and delivery of 1 (One) Multistage Pump aggregate type: 42DMSD200-3a. Brief description: The main objective of the project was manufacturing of 1 (One) pump aggregate unit for the needs of REK Bitola for transport of water. Realized activities: Production and delivery of 1 (One) […]

MINE ZD RMU “Abid Lolić”, BiH

Previous Next MINE ZD RMU “Abid Lolić”, BiH Project: Production and delivery of 2 ( Two) Multistage Pumps type: KCP62-8. Brief description: The main objective of the project was manufacturing of 2 (two) pump units for the needs of Mine ZD RMU “Abid Lolić”, BiH for transport of Mine water . Realized activities: Production and […]

ERAX-INVEST d.o.o BiH

ERAX-INVEST d.o.o BIH Project: Production and delivery of Multistage Pumps type: KCP62-8. Brief description: The main objective of the project was manufacturing of 2 (two) pump units for the needs of Mine ZD RMU “Abid Lolić”, BiH for transport of mine water . Realized activities: Production and delivery of 2 (two) Multistage Pumps, type PP1,5 […]

Buchim mine – Radovish, Macedonia

Buchim mine – Radovish, Macedonia

Buchim mine – Radovish, Macedonia Project: Manufacturing, delivery and installation of 3 booster sets for a pumping station in Buchim mine – Radovish, Macedonia. Brief description: 3 booster sets (consisted of 4 vertical multistage centrifugal pumps each) were installed in order to protect the environment from the polluted water that is generated by the mine’s […]

UNDP – Macedonia

r24a

UNDP – Macedonia Project: Manufacturing, delivery and installation of 1 booster set for Buchim mine – Radovish, Macedonia, funded by UNDP. Brief description: MZT Pumpi, in consortium with the company Euroing Gevgelija, produced and installed one booster set (consisted of 3 pcs of Singe-stage centrifugal pumps) for the client UNDP – Macedonia, meant for use […]